[ Roofing ]
A roofing bid is a warranty bid. Manufacturer terms, uplift classification, and the condition of what is already up there each move the price more than square footage does.
Every document that governs a roofing bid, and the ones that hide something.
9 documents in this roofing package. 5 of them carry something that changes the number, and only one of those is a drawing.
One extract from the roofing documents, at the scale an estimator reads it.

Each one cited to the document and page that proves it, so an estimator can verify it, price it, and approve the move.
A manufacturer no-dollar-limit warranty is required for twenty years and quoted for fifteen. The upgrade is priced by the manufacturer, not the installer.
WARRANTY GAPThe specified uplift classification requires a fastening pattern and deck condition the drawings do not show. Attachment density is the cost.
ASSEMBLY CHANGEThe roof plan gives an average R-value where the specification requires a minimum at the drain. Tapered packages price very differently against each.
MATERIAL DELTARecover was assumed at the walkthrough and full tear-off is specified. Disposal, deck repair, and temporary protection follow the specification.
WHOLE BIDIllustrative of the conditions this trade bids. Named pursuits, companies, and prices across this site are fictional.
The same trade prices very differently depending on what is being built.
Industrial & warehouseLarge single-ply areas where a fastening pattern change reprices the whole roof.
EducationOccupied-building phasing and summer completion dates tied to liquidated damages.
CommercialExisting conditions surveys issued as an addendum after pricing has started.
HealthcareRooftop equipment coordination and infection-control barriers written into the front end.
CivicPrevailing wage and certified payroll obligations attached to the roofing scope.ArosBid reads the pre-bid minutes and every addendum alongside the specification, so an assumption made at the walkthrough is checked against the document that governs it.