The number is set by distribution equipment you cannot get quickly and by scope that lives on the seam between Division 26, 27, and 28. Both risks are readable in the documents before the bid goes out.
Every document that governs a electrical bid, and the ones that hide something.
9 documents in this electrical package. 6 of them carry something that changes the number, and only one of those is a drawing.
One extract from the electrical documents, at the scale an estimator reads it.

Each one cited to the document and page that proves it, so an estimator can verify it, price it, and approve the move.
Conductor sizes on the riser diagram and the feeder schedule do not agree. The difference is copper, and copper is the bid.
SCOPE GAPSwitchgear quoted at a delivery date that lands after the milestone it feeds. The escalation and the liquidated damages both belong to whoever missed it.
SCHEDULE RISKStructured cabling and fire alarm are excluded from Division 26 and never appear in their own sections. Pathways stay yours; the head-end does not.
SPLIT SCOPEGeneral conditions assign temporary power and lighting to the electrical subcontractor. The invitation package treats it as general work.
UNPRICED SCOPEIllustrative of the conditions this trade bids. Named pursuits, companies, and prices across this site are fictional.
The same trade prices very differently depending on what is being built.
Data centersGenerator, UPS, and ATS sequences that determine the equipment list before any takeoff starts.
HealthcareEssential electrical branches and the transfer times the specification will not negotiate.
EducationLighting control narratives written in the spec and drawn nowhere.
IndustrialMotor schedules and process loads issued by addendum after the invitation.
Commercial officeBase building versus tenant scope split across two specification sections.Gear quotes arrive late and expire fast. ArosBid tracks every RFQ, chases the trades still missing coverage, and reconciles each quote against the schedule it has to hit.