Every page of the tender, read.Every number, recomputed.

Every send, approved.

Every page readEvery number recomputedEvery send approved

SCROLL Open the bid command center

Built for

…and every trade that bids.

Mechanical
Electrical
Plumbing
Roofing
Steel

[ Bid day, as it actually happens ]

The estimate isn’t where bids break.
The process around it is.

25–30

documents and addenda in a single pursuit

The date that disqualifies the bid can be buried anywhere in the set.

20 min

before close, late vendor quotes arrive

Leveling turns into a sprint while the submission clock keeps moving.

1 clause

can turn a winning number into a loss

A missed exclusion, warranty gap, or bad total walks straight into buyout.

[ What it catches ]

Four traps.
Caught before close.

Each catch is tied to the document and page that proves it—so the estimator can verify it, price it, and approve the move.

TRAP 01WHOLE BID

Mandatory site visit

Spec 01 11 00 §1.8 · page 3

Absent from the invitation email. Non-attendance disqualifies the bid.

TRAP 02SCOPE GAP

Spec vs drawing conflict

Chiller schedule · drawing M-401

Spec calls for 350 tons. The drawing schedule calls for 400. RFI drafted before pricing.

TRAP 03+$42K / +$27.5K

Excluded startup + short warranty

Vendor quote · fine print

Startup labor excluded. One-year warranty offered against a two-year requirement.

TRAP 04Δ $500,000

Total ≠ itemized sum

Vendor quote · total check

The stated grand total and the sum of its line items differ by half a million dollars.

From the Riverside Office Tower demo scenario. Names, companies, and prices are fictional.

[ How a bid runs ]

Ten stages.
A human gate at every send.

01 / 10
Intake stage01

Intake

Recognizes the ITB and creates the pursuit workspace.

Human gate · Read-only
Setup stage02

Setup

Drafts the close calendar and project structure.

Human gate · Calendar invite
Document review stage03

Document review

Finds dates, risks, conflicts, LDs, and alternates.

Human gate · Invites + RFIs
Bid / No-Bid stage04

Bid / No-Bid

Scores the pursuit against GC history and past bids.

Human gate · Decision
Equipment BOM stage05

Equipment BOM

Builds a cited BOM with installed labor hours.

Human gate · BOM
Vendor RFQs stage06

Vendor RFQs

Drafts trade packages and follow-up reminders.

Human gate · Every send
Leveling stage07

Leveling

Normalizes quotes and reconciles every total.

Human gate · Award rec.
Budget stage08

Budget

Maps approved values into the Excel workbook.

Human gate · Export
Proposal stage09

Proposal

Assembles scope, clarifications, and exclusions.

Human gate · Package
Readiness stage10

Readiness

Confirms bonding, addenda, alternates, and gates.

Human gate · You submit

Control is architecture

Three rules that
do not move.

This is how an estimating team lets AI near the bid without giving it authority it should never have.

SEND / 01

Nothing
auto-sends.

The mail connector refuses to release anything unless the request cites a recorded, approved decision.

MONEY / 02

Money is code,
not a model.

Every extension, sum, reconciliation, and allowance uses deterministic integer-cent calculations.

ACCESS / 03

The agent never
sees your keys.

Capability-scoped connectors hold credentials, enforce access, and write every allowed or denied request to the audit log.

[ After the bid goes out ]

The bid doesn’t end when you submit it.
Neither does ArosBid.

Buyout, bonds, turnover, and debrief run in the same workspace that priced the job—so nothing is re-keyed and every loss teaches the next bid.

  1. Ready
  2. Submitted
    • Submitted amount + award clock
    • BAFO timeline
  3. Awarded
    • Bonds + award steps
  4. Buyout
    • Draft buyout PO
  5. Turnover
    • Turnover package
↩ Every loss feeds the next bid
  • Loss debrief
  • Bid-to-win gap
  • Compounding cost history

[ The portfolio brain ]

Every loss makes
the next bid smarter.

Closed pursuits feed the cost library, bid-to-win gap, GC scorecards, and vendor history—turning bid history into the context for the next decision.

Portfolio / liveHistorical context loaded
  • LOSTRiverside Office Tower+3.4% vs winnerCost library
  • WONNorthgate STEM Centermargin held at 1.1%GC scorecard
  • LOSTCascade Logistics Hublate vendor quoteVendor history
  • WONHarborview Medical Annexalternates priced earlyCost library
  • LOSTMeridian Business ParkLD terms underpricedBid / No-Bid model
  • WONLakeside Civic Centrebuyout gap 0.6%Cost library
  • LOSTSummit Ridge Data Hall+5.2% on equipmentCost library
  • WONFairview Transit Depotfull vendor coverageVendor history
Bid-to-win gap2.7%

Across comparable mechanical pursuits

Vendor coverage3

Trades need one more quote

Cost library18

Closed bids updating the library

GC scorecard
Invite oftenAward selectively

Per-GC history from every closed pursuit

[ Autonomy ladder ]

Autonomy grows.
The approval gate never moves.

You decide how much of the cycle runs on its own. What leaves your office is always something a person approved.

Orchestrate

Runs all ten stages end to end. Every send still stops at the gate.

L4 · OrchestrateThe gateNever movesYour office

Connected construction stack

Your tools stay.
ArosBid connects the bid around them.

Move tender intake, documents, approved numbers, and project handoff through the tools your team already knows. Your takeoff workflow stays exactly where it is.

[ Deployment & ownership ]

Your instance.
Your data.
Your identity.

01Your own isolated deployment and subdomain

02Your own database and document store

03Your branding throughout the product

04Your Microsoft Entra ID SSO

“On your data, owned by your team.”— Arosplatforms

[ Questions ]

Asked on every
first call.

Where does our data live?

In your own isolated deployment, with your own database and document store, on your own subdomain. Your team signs in with your Microsoft Entra ID.

Does ArosBid replace our takeoff software?

No. Trimble AutoBid, STACK, McCormick, and FastEST stay exactly where they are. ArosBid runs the bid around them.

Can it send anything on its own?

No. Nothing auto-sends. The mail connector refuses to release anything unless the request cites a recorded, approved decision.

How are the numbers computed?

Money is code, not a model. Every extension, sum, reconciliation, and allowance uses deterministic integer-cent calculations.

What does it plug into?

Outlook, OneDrive, and Excel natively. Bid sources like BuildingConnected, Dodge, PlanHub, and ConstructConnect connect; the rest of your stack stays put.

How do we see it on our own work?

Book a live walkthrough of the full cycle, intake to submission. Your demo instance is branded as your company before the call starts.

See ArosBid live

Your next bid,
run end to end.

A live walkthrough of the full cycle—intake, document review, leveling, proposal, and submission—with a human gate on every send.

Book a live demo Your demo instance is branded as your company before the call starts.