Construction tender review. Page and clause.

ArosBid reads the set — front end included — and cites every finding to the document and page that proves it.

Review is not a summary

A tender review that cannot be opened to a page is a rumor. ArosBid returns the section, the paragraph, and the sheet, so an estimator can verify a finding in seconds and decide whether it is real.

The line that disqualifies the bid

Mandatory site visits, registration deadlines, prequalification, bonding thresholds — they live in Division 00 and 01, often off the invitation email, sometimes issued by addendum after pricing has started. Miss one and the whole estimate was spent on a bid that will not be opened.

Field note: The line that disqualifies the bid.

Spec vs drawing

Specification and schedule are written by different people and issued as though they agree. A chiller that is 350 tons in the spec and 400 on drawing M-401 is equipment, electrical service, steel, and lead time — and the order-of-precedence clause usually says the spec governs. The window for the RFI is before the number is set.

Field note: Spec says 350 tons. The drawing says 400.

Missed addenda

An addendum that reached the folder but not the person doing pricing is a silent scope change. Review includes every addendum against what was already read, so a late package is a change rather than a surprise at buyout.

What this is not

Not takeoff. Not a plan room. Not a replacement for the estimator’s judgment about whether a conflict is real. The reading is automated. The decision stays with the person who will carry the number.