[ Estimating and bidding ]

Construction estimating and bidding software for specialty trade contractors.

Reads the full tender, recomputes every number, and flags scope gaps before submission. Takeoff included. A human approves the send. Built for mechanical, electrical, plumbing, roofing, and steel.

Book a live demo

What you can check on a walkthrough.

Three claims that are architecture, not a pitch. None of them is a customer story we do not have.

  1. 01Estimating and bidding are one desk

    Takeoff, the estimate, the tender, vendor leveling, scope gaps, and the approval sit in one workspace. The bid management page is the process after the ITB. This page is the category.

  2. 02Money is code

    Every extension, sum, reconciliation, and allowance uses integer cents. A language model reads. It does not price the job. You can recompute any total by hand.

  3. 03The send is a person

    During training, nothing leaves without a recorded human approval. Scope gaps are flagged before submission. The gate does not move because the category name got longer.

Estimating

Estimating is the number. Labor, material, equipment, subcontract quotes, overhead, and the price you are willing to submit. On a specialty trade desk that number is not a general contractor’s coverage tab. It is your scope, after the invitation is already yours.

ArosBid includes takeoff and estimate and replaces Trimble AutoBid. Money is deterministic integer-cent code. A language model does not price the job. The category name on this URL is estimating and bidding together, because a number that never passed through the tender is not a bid you can defend.

Takeoff

Takeoff is quantities from the drawings. It belongs in the same workspace as the estimate. ArosBid includes it because the product replaces Trimble AutoBid. The combined-job page is takeoff and estimating software. The MEP framing, with an explicit refusal to claim STACK, is MEP takeoff software.

Quick Bid is a different seat in the market: the estimate, usually fed by On-Screen Takeoff. If that is the name you searched, the page is QuickBid alternative. This hub does not reprint that comparison.

Tender review

Tender review is the reading. Every page. Dates, conflicts, liquidated damages, alternates, and the front-end clause that can disqualify a correct quantity. Findings are cited to document and page. A finding you cannot open is a rumor. The category page for that reading is AI tender review. The way AI sits on the estimating job — read, then price in code, not a chatbot — is AI construction estimating.

Bid leveling

Bid leveling here is your vendors, not a general contractor lining up subcontractors. Stated totals reconciled to itemized sums. Exclusions lifted and treated as scope. The real low bid is the one that still stands after that check, not the smallest cover total. The desk is vendor quote leveling. The category split from GC-to-sub is bid leveling software.

Empty conference table after hours. No screens.

Scope gaps

A scope gap is work the documents assign and the number does not carry. Spec versus drawing. “By others” on a system you still have to feed. An exclusion in a vendor quote that the spec still requires. Those are flagged before submission. They are not a savings percentage, and this page will not invent one.

Mechanical, electrical, and plumbing traps stay on their own pages, reached from MEP estimating software. Roofing and steel stay on their industry pages. This hub names the gap. It does not reprint every sheet.

Approval

Approval is the send. During training, nothing leaves without a recorded human decision. The mail connector refuses a send that does not cite that decision. It learns the pattern you already signed off, then automates it. The approval gate does not move. L5 Autonomous is next. You still own the bid that goes out.

Estimating and bidding versus bid management

Construction bid management software on this site is the process after the ITB: intake, review, bid/no-bid, vendor RFQs, leveling, proposal, readiness. It is explicitly not a plan room and not GC-to-sub. Use that URL when the search is the process.

Use this URL when the search is the category: estimating, takeoff, tender review, bid leveling, scope gaps, and approval, for a specialty trade contractor. The two pages point at each other so a crawler can tell them apart. Neither one is a bid board. Invite sources connect. They are not the number.

The role page is for estimators. The named AutoBid comparison is vs AutoBid. Book a live demo at Book a live demo. No customer names, logos, win rates, or savings percentages. Photographs are location stills reused from existing ranking pages.

Empty estimator office. Plans and a desk. No product chrome.

[ FAQ ]

Asked on the first call.

What is construction estimating and bidding software?

On this site it is the specialty-trade seat that estimates and bids: takeoff, the number, a full tender read, vendor leveling, scope gaps, and a human approval before submission. Not a plan room. Not a GC bid board.

How is this different from construction bid management software?

/construction-bid-management-software is the process after the ITB is already yours: intake, review, bid/no-bid, vendor RFQs, leveling, proposal. This page is the category those stages belong to — estimating and bidding — so the two URLs do not pretend to be the same search.

Does it include takeoff?

Yes. ArosBid includes takeoff and estimate and replaces Trimble AutoBid. STACK, McCormick, and FastEST are other takeoff tools in the market. We do not claim them.

Does a model set the price?

No. The model reads the tender and the vendor PDF. Integer-cent code recomputes the numbers. No language model prices the job.

Who is it for?

Specialty trade contractors: mechanical, electrical, plumbing, roofing, and steel. The MEP hub is /mep-estimating-software. A QuickBid alternative search is /quickbid-alternative.

Are the stills live work?

No. Photographs are cinematic location stills reused from existing ranking pages. Named pursuits in the walkthrough, including Riverside Office Tower, are fictional demo data and labeled as such.

Empty lobby corridor at night. No signage.

Run estimating and bidding on your own pursuit.

Book a live demo